OSHA Elec practice test 11

25 multiple-choice questions for the OSHA Electrical Safety (Subpart S) Practice Test. Pick an answer to see the rule behind it, quoted from the official source.

1. A worker is determining if a specific tank used for refining materials falls under the definition of 'Electrolytic cells.' What is the defining characteristic of this equipment?

2. An electrician is installing a new disconnecting switch for a specific motor in a factory. The switch is located in a panel room where multiple switches are arranged in a row, and the purpose of each switch is not immediately evident from its location or arrangement. What must the electrician ensure regarding the marking of this disconnecting means?

3. An electrician is connecting a power cable to a mobile machine. How must the terminals of the power cable be enclosed?

4. An industrial worker is servicing a center pivot irrigation machine. Regarding the disconnecting means for each motor and controller, what is the required feature for safety during maintenance?

5. A worker is using a flexible electric cord to connect portable equipment. How must the worker handle the cord when raising or lowering the equipment?

6. When using single-pole portable cable connectors for AC applications, what type of connector is required and what labeling is needed if paralleled sets are used as input devices?

7. An electrician is installing a physical obstruction to prevent workers from contacting live parts in a substation. According to OSHA definitions, what is this obstruction called?

8. An electrician is working on the back of an enclosed control assembly where rear access is required to work on de-energized parts. What is the minimum horizontal working space that must be provided?

9. A facility manager is reviewing electrical installations to determine which ones must comply with the design safety standards in §§ 1910.302 through 1910.308. Which installation date threshold triggers the requirement for every electrical installation and all utilization equipment to comply with these provisions?

10. A qualified electrician is working directly on an installation listed in the scope of §§ 1910.331 through 1910.335. Under which condition do these specific work practice provisions NOT apply to this qualified person?

11. An electrician is installing temporary wiring for a construction site. Which of the following is a required practice for branch circuits supplying receptacles or fixed equipment when run as open conductors?

12. A ground worker needs to contact a vehicle or mechanical equipment that is operating near energized overhead lines. Which condition allows the ground worker to contact the equipment?

13. An electrician connects a motor to a branch circuit using a cord and plug. If individual overload protection is omitted, what is the maximum rating allowed for the attachment plug or receptacle at 125 volts?

14. An electrician is routing a flexible extension cord across a construction floor where it must pass through a doorway. What is required to comply with safety standards for this pinch point?

15. A worker is preparing to terminate a shielded cable in a system over 600 volts. What must be done with the metallic shielding components at the termination point?

16. An electrician is routing open conductors through a wall partition. To prevent contact with the wall material, what type of material must the tubes or bushings be made of?

17. An electrician is designing an indoor electrical installation that is accessible to unqualified persons. The installation includes a ventilated dry-type transformer. What design feature is required for the openings in this transformer?

18. An electrician is installing cartridge fuses on a circuit over 150 volts to ground that are accessible to unqualified persons. What additional component is required to allow safe disconnection?

19. A qualified electrician is installing circuit breakers in an area accessible only to qualified employees. Which mounting method is permitted in this specific location?

20. An electrician is installing an aerial cable with a metal sheath entering a building where it is exposed to contact with electric light or power conductors. What must be done to the metal sheath?

21. An electrician is setting up temporary lighting on a construction site. Under which condition is it permissible to suspend the lights by their electric cords?

22. In a multiphase system where one phase is used as a neutral conductor, what is the required grounding action for that neutral conductor?

23. An industrial worker is installing a conduit run in a hazardous (classified) location. What is the required method for making the conduit joints?

24. An industrial worker is preparing to inspect and repair equipment that requires complete isolation. If the isolating means are not designed to interrupt the load current, what must be provided?

25. When barricades are used to limit employee access to work areas with uninsulated energized conductors, what restriction applies to the material of the barricades?