⚡ OSHA Elec Practice Test

DMV Practice Test Hub › OSHA Elec › Practice test 14

OSHA Elec practice test 14

25 multiple-choice questions for the OSHA Electrical Safety (Subpart S) Practice Test. Pick an answer to see the rule behind it, quoted from the official source.

1. An electrician is installing overcurrent devices in a location where they are readily accessible. To avoid creating an employee safety hazard, where must the electrician ensure the devices are NOT located?

2. In a work area with uninsulated energized conductors, safety signs and barricades are in place, but they do not provide sufficient warning and protection from electrical hazards. What additional measure is required?

3. A technician is working in an information technology equipment room and needs to disconnect power to the dedicated HVAC system serving the room. Where must the control for this disconnecting means be located?

4. A crew is installing outdoor lighting. Where must the lamps be located relative to live conductors and transformers to ensure safe relamping operations?

5. When installing conductors in a tunnel, which of the following is a required method of installation?

6. An electrician is about to deenergize a circuit for maintenance. When must the safe procedures for deenergizing that circuit be determined?

7. For underwater lighting fixtures operating at more than 15 volts in a permanently installed pool, what safety device must be installed in the branch circuit?

8. Under the assured equipment grounding conductor program, who is responsible for implementing the program on a construction site?

9. A worker needs to access a pull box for a system operating over 600 volts, nominal. What marking is required on the outside of the box cover to ensure it is readily visible and legible?

10. A worker is accessing the working space about electric equipment. What is the minimum requirement for access to this working space?

11. A worker is charging batteries on a construction site. What is the required status of the battery vent caps during the charging process?

12. An electrician is installing a panelboard enclosure in a damp location and plans to mount it directly against a concrete wall. Under what condition is this installation permitted without the required airspace?

13. A worker is servicing a separately derived AC system (50-1000 volts) supplied by a transformer with a primary voltage rating of 480 volts. The system is used exclusively for control circuits and continuity of control power is required. To legally leave this system ungrounded, what additional condition must be met?

14. A worker is installing equipment with NPT threaded entries for field wiring connection in a hazardous location. What type of conduit or cable fittings must be used?

15. During a tunnel installation, an electrician is wiring a motor. What is the specific requirement for the disconnecting means at the motor location?

16. An electrician is installing fixed lighting fixtures in a Class I, Division 2 hazardous location. According to marking requirements, which of the following is true regarding the marking of these fixtures?

17. A worker is running open conductors over an area subject to truck traffic, but it is not a public street, alley, road, or driveway. What is the minimum vertical clearance from the ground required?

18. A worker is maintaining a storage battery room. What provision must be in place to prevent the accumulation of explosive mixtures from the batteries?

19. An electrician is connecting a single-throw knife switch to a circuit that is inherently capable of providing a backfeed source of power. If the blades and load terminals may remain energized when the switch is open, what must be installed?

20. An electrician is installing control panels for an elevator that are located in a separate room from the drive machine. How must these panels be housed to comply with safety standards?

21. An industrial worker is connecting a No. 12 copper conductor to a terminal using a pressure connector. To comply with the requirement for ensuring a good connection without damaging the conductor, which method is permitted for this size conductor?

22. An electrician is installing a service disconnecting means for a system rated over 600 volts, nominal. What additional safety measure is required for service-entrance conductors installed as open wires?

23. An electrician is working on the controls of a crane where the main disconnecting means is not readily accessible from the operating station. What safety provision must be in place at the operating station?

24. A qualified person is working on an aerial lift insulated for the voltage involved near energized overhead lines. Under which condition may the clearance between the uninsulated portion of the lift and the power line be reduced to the distance given in Table S-5?

25. A worker is installing a new receptacle on a 15-ampere branch circuit. What type of receptacle is generally required?

← Test 13 · All tests · Test 15 →